Early dismantling sliding mode scheme of box structure tripod combined with buckle frame

创建于2024.08.23
——Suitable for construction conditions where the side walls and roof of box structures such as pipe galleries, subways, underpasses, culverts, etc. are supported with formwork simultaneously (for projects where the side walls are supported with formwork on one side, or for projects with high waterproof requirements that do not allow the installation of tie rods)
Advantages of the plan:
  1. The side walls are reinforced with triangular trusses, and the overall stability of the formwork is high.
  2. Realize modular overall mobile turnover and increase construction efficiency by three times.
  3. Setting up a late dismantling belt at the mid span of the structure enables an early dismantling system solution, improves the turnover efficiency of templates and supports, and reduces material input.
0
  1. Airport Engineering Template Scheme - Pouring 1
0
  1. Airport Engineering Template Scheme - Pouring 2
Contact
Leave your information and we will contact you.

About us

Customer services

Help Center
Feedback

Contact Us

Fixed telephone number: +86-591-22918758

Tel: +86-18695606058

whatsapp/wechat:0086 15959199583

E-mail: 158591544@qq.com