——Suitable for the construction of subway and underpass main side walls, not limited by structural height
Advantages of the plan:
- The overall integrity of the formwork is good, and the pouring effect such as flatness and smoothness can be controlled.
- Modular design allows for the adjustment of mold frame height to meet different height requirements.
- Overall weight reduction and improved operational safety.
- Automation systems such as hydraulic and motor systems can also be added to achieve automation of formwork construction processes such as formwork support, demolding, and turnover.
Shenzhen Metro Line 9 Phase II (Zhongshui Eighth Bureau)
Side Wall - Heshang Station Project in Area 3 of Section 2 of Fuzhou Metro Line 6- China Railway Third Bureau Second Company